-
Troubleshooting on customer`s site
Site inspection of power cable fault in Hubei University, granted by State Grid Corporation of China (Wuhan Power Supply Co., Ltd.). Fast and precisely troubleshooting has been done within 2hrs, by our optimum configured power cable fault testing system.
2021-10-19 -
Customers From India Bought A Batch Of Equipment From GDZX
In November 2019, old customers from India inquired about 6testing equipmentfrom GDZX, including 3 set test transformers, 1 set oil trace moisture analyzer ZX-106, 1setcomprehensive instrument transformer CT PT Analyzer and 1 set Micro Ohm MeterZXHL-400P.
2020-05-19 -
Notice of GDZX Chinese New Year Holiday in 2020
Spring Festival, the lunar new year, is the first of a year, the traditional sense of the "New Year's day.". Wuhan GDZX Power Equipment Co., Ltd.,announced the notice of Spring Festival holiday in 2020 as follows:
2020-01-10 -
Many Customers Purchased Power Tester From GDZX
At the end of 2019, many customers from India, Italy, Vietnam,Thailand, signed a purchase contract with our company to purchase standard power source, AC hipot tester, CT PT analyzer, Transformer contact tester and withstand voltage tester from Wuhan GDZX
2020-01-10 -
Looking Back On 2019 -GDZX
After winning the bid for the Baoding Power Project, we are facing severe tests and challenges. This is not only a political task, but also a basic guarantee for the smooth progress of the entire military games.
2020-01-03